Saturday, March 3, 2012

Harry Bowers


HOLE #14 (2007) prior to the removal of 50+ trees limiting the playability of the hole, quality of turfgrass and increasing the frustration level of many.

Harry Bowers designed the new "9" holes in 1991. These holes encompass #'s 6,7 10-14. The routing of the holes and locations of teeing grounds is exceptional.

"The great value of a hazard is not that it catches a shot that has been missed, but that it forces a miss upon the timid player, its psychological miss is greater than its penal value." Bobby Jones
This quotation sums up the values by which Harry Bowers implements in his designs.

His design requires exceptional shot accuracy on approach. Just like with Thompson a golf course evolves over time and the new 9 was very narrow to begin with, but has matured and required exceptional shot making abilities. This narrowing leaves a very small margin for mistake and can slow pace of play and be exceptionally penal to the higher handicap.

Scott Witter a local golf course architect designed hole #8 and #9. Also, Witter aided in the redesign of several areas of the golf course. Hole #14 was one of these areas. 50+ trees were removed, the greenside bunker was eliminated allowing for increased accessibility of the green site on the approach. The shot is still demanding and requires accuracy, but there is no longer a need to work the shot in one specific direction in order to hit the putting surface.

Monday, January 30, 2012

Stanley Thompson


After the removal of the tree on #16 I wanted to give the membership some history of the club and the evolution of a golf course. More information on Stanley Thompson and notice the origianl sketch of the 9th green and the clubhouse location.

Stanley Thompson was a world renowned architecht and was Canada's most prolific golf course architecht. He re-designed the original 9 holes in the 1950's and LTCC is a great portrayal of his use of terrain.


Here is a picture of the 15th green in 2005. The bunkers were removed due to drainage issues and the green had become smaller due to the invention of the riding greensmower. The riding greensmower could not make the tight turns necessary to maintain sharp corners on greens. This resulted in the greens contours becoming rounded.



This picture was taken in the summer of 2011. Notice the green expansions and the detailed corners increasing the size of the putting surface. These were the original contour lines designed by Stanley Thompson. Golf courses are ever being changed by many different factors and I believe we need to maintain the property as close to the original design as possible.

16th Approach Shot 2005 - Picture taken from left side of fairway 120 yards out.

Stanley Thompson himself summarizes his design philosophy by saying, "The most successful course is one that will test the skill of the most advanced golfer without discouraging the duffer while adding to the enjoyment of both.”

Stanley Thompson in About Golf Courses Their Construction and Up-Keep;1923

Next Month will give some history of the new 9 Harry Bowers(1991) and Scott Witter (1998)

Monday, January 9, 2012

#16 Beech Tree - Removal



The tree in front of #16 has been removed. This has been a very controversial tree for myself due to it's affect on the playability of the hole. The tree was analyzed by our local golf course architecht last year and he came to the conclusion the tree was not part of the original intent or design of the hole. The mounding in front of the green was the original intent by creating a visual obstruction. The tree was also analyzed by an arborist and the tree was dubbed a hazard and at risk of falling. This was confirmed during the tree removal process.



All Beech Trees are at risk of Beech Bark Disease. A condition, which begins with an infestation from an insect called the Beech Scale. The infection of the scale insect leaves a pre-disposed risk of an infection by Nectria fungi that will destroy the heartwood of the tree. This destruction of the heartwood increases the risk of falling limbs or catastrophic loss due to the weakened condition. These symptoms were found on 75% of affected limbs and severe basal rot. It was not a question of if the tree will fall, but when.

Monday, July 18, 2011


There was a very rapid change in weather we went from a wet April & May to an average June and now a bone dry July. The squeggee's were packed away and the hoses were drug out.We have a very solid crew that has done large amounts of handwatering to make up for the defeciencies of our irrigation system.
Here are some additional jobs completed this past month.

We once again had problems with zebra muscles plugging up the siphon line, which fills our irrigation pipe. A high pressure flush is done, but now the elevation of the canal is dropping rapidly and we may need to make alternative arrangements to get our water.


Servicing of the golf carts is completed monthly during the offseason and every 3 weeks during the summer. We check the battery terminals, water level, tire pressure and neutralize acid on the battery tops.

This is a picture of some insect damage we had on the collars of some greens. The insect pest is called Annual Bluegrass Weevil and feeds on the weedy grass. If not controlled the insect will feed on the bentgrass. We had to make a treatment for this pest as well as Cutworm.

The tee signs were weeded and mulched. Between all the maintenance items on the golf course it's very difficult for us to maintain these areas as we should. Some areas still have very maintenance intensive plants and this adds to the labor issue.

Henry our equipment manager has had his hands full to say the least. Here he is tearing down 75% of the mower to repair internal components of a hydraulic pump. Jacobsen the manufacturer only had 2 options for us. option 1 was to replace the pump @ a cost of $2500. Option 2 was a small re-build kit of unnecessary parts for $900. Henry took it upon himself to cross a number with a direct ditributor at a cost of $90. Outsourcing this job would have cost $4000. Henry has been with us for 6 years and is a huge asset to the club.

Friday, June 24, 2011

Staffing

It took all available resources this spring to keep up with mowing and limit the amount of damage to wet saturated soils. As a result we are behind on many of the aesthetic touches that bring out the most LTCC has to offer. We apologize for the lack of definition in many areas of the golf course, but are getting caught up very quickly. The main focus has been greens, tees, fairways, rough and bunkers. Now the attention is being directed toward peripheral areas of the golf course eg. tree stumps, OB stakes, trimming and landscape beds. The landscape beds are the most tedious and time consuming especially without the assistance of a horticulturalist on staff. We will do our best and are now at full staff. The additional staffing will ease some of the burden as many helping hands make much lighter work.

#12 Construction



Due to the inclement weather this spring the bunker construction was put on hold until August. By no means is the hole completed, but rather was finished in a way to make it playable as soon as possible with costs taken into consideration. The fairway on the right hand playing side was not expanded or sodded, so we have temporarily overseeded the area with ryegrass. In August construction will once again begin where the fairway will be widened by as much as 10 yards in some locations. Accompanying the widening of the fairway 2 bunkers will be added on the left hand playing side of the hole. We are sorry for the inconvenience and any interuptions in play.

Thursday, June 2, 2011

Aerification Scheduled for Monday June 6th

As you all know aerification was postponed due to the wet weather. Since we are so far into the golf season a less invasive process will begin to the greens on Monday. This process WILL NOT remove any thatch, but rather relieve surface compaction and increase air exchange through the soil. This season we will be topdressing the greens with sand to dilute the organic matter levels and firm the putting surfaces more frequently. Here's a video of the process we will be performing on Monday. The greens will be firmer, faster and roll truer after this process because of the rolling and the addition of the sand to the profile of the greens. Please don't be scared off by the word aerification next week. The weather looks great!!